Postby Simba » Fri Apr 05, 2013 2:40 pm
I too still have very big doubts that this will be open in May, considering the amount of testing they will have to do, If my memory serves me correctly Saw The Ride did almost a thousand test runs before opening to the general public, so I would imagine that The Smiler would do a similar amount if not more, and would also probably need to do a pull through to make sure their will be no coalitions with the trains and the interlocking track.
Simba - Coaster Zone Administrator
Most rides on Icon (BPB): 32 (8/10/18)
Most rides on The Swarm (TP): 86 (24/08/2015)
Wicker Man - Coaster Ride Count: 2019 (13)
Previous End Of Season Total Ride Counts On Wicker Man:
2018 (46)
Wicker Man - Grand Total Coaster Ride Count (59)
Important Links
Look at all this amazing Coastery stuff in my profile :)
You can easily add yours in the UCP